- Got some 6" squares cut for my scrappy denim rag quilt that I am working on (for the other side).
- Attached most of the binding on my red-and-white storm at sea.
- Started the hanging sleeve for it.
- Bought a new ink cartridge for my printer so I can now print a label for the red-and-white.
- Tore into a bunch of boxes and made an absolute mess in the living room (that where I sew). Sigh.
- Sewed some 2" square pairs together.
- Turned my table around, put two large cutting mats on it and taped them together. I am preparing to layer some quilts and will NOT do it on the floor.
10 October 2016
Weekend progress
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment